Separate the components before writing metrics
Write separate SLA scopes for each component rather than one blended commitment. The three components below do different work, so each needs its own availability commitment.
| Component | What it covers |
|---|---|
| Control plane | Policy authoring, configuration, identity and permission management. |
| Enforcement data plane | Policy decisions in the request path for model, tool-call, and MCP traffic. |
| Audit pipeline | Log ingestion, durability, and delivery to the customer. |
Policy evaluation latency
Require policy evaluation latency at p50, p95, and p99, and define the measurement boundary in the contract. The boundary states where timing starts and stops, so that vendor and buyer measure the same thing.
Specify failure-mode behavior per risk tier
The RFP should require an explicit fail-open or fail-closed behavior for each risk tier. Ask the vendor to state, per tier, what happens to a request when a policy decision cannot be made in the request path.
Why this belongs in the contract
Failure-mode behavior is a clause to be tested, not a design preference to be assumed. Write it so that it can be verified in a proof of concept.
Define availability, exclusions, reporting, and remedies
Availability
Request separate availability commitments for the control plane, the runtime enforcement data plane, and audit logging.
Exclusions
Require clear exclusions, so that it is unambiguous what time or events do not count against the commitments.
Reporting duties
Specify what the vendor must report against each commitment, so that performance can be checked rather than asserted.
Remedies
State the remedies that apply when a commitment is missed.
Validate vendor answers before signing
Each clause should be testable in a proof of concept. Use the checks below to confirm vendor answers before signing.
- Measure policy evaluation latency at p50, p95, and p99, using the measurement boundary defined in the contract.
- Confirm the fail-open or fail-closed behavior stated for each risk tier.
- Confirm that availability commitments are stated separately for the control plane, the enforcement data plane, and audit logging.
- Review the exclusions, reporting duties, and remedies for clarity.