What ISO/IEC 5338 Defines
Why the Gap Surfaces Late
A 30-Day Assessment Sequence
| Week | Focus | What Happens |
|---|---|---|
| Week 1 | Inventory and Baseline | Inventory AI systems in use, identify the life cycle stage of each, and catalog existing governance documentation against ISO/IEC 5338 process categories. |
| Week 2 | Control Mapping | Map existing technical controls, including identity, access, monitoring, and logging, to specific lifecycle processes to surface documentation and control gaps. |
| Week 3 | Validation | Validate findings through interviews and evidence review with engineering, security, and risk teams to confirm control maturity claims. |
| Week 4 | Prioritization and Roadmap | Prioritize identified gaps by risk and produce a remediation roadmap with named owners and target timelines. |
Evaluation Criteria for a Defensible Assessment
- Confirm the methodology maps explicitly to ISO/IEC 5338 process categories rather than a generic AI governance checklist.
- Verify that agent identity and permission data can be traced to specific lifecycle process evidence.
- Separate documentation and policy gaps from runtime enforcement gaps in the final report.
- Cross-reference findings with ISO/IEC 42001 and NIST AI RMF to avoid duplicative remediation work across overlapping requirements.
- Assign a named process owner for each lifecycle stage to support audit defensibility.